To avoid personal injury or damage to the panelboard assembly, always
securely fasten the cast aluminum breaker housing before securing the
terminal housing.
To avoid the risk of explosion, always clean both flat joint surfaces of body
and cover before closing. Dirt or foreign material must not accumulate on
flat joint surfaces. Surfaces must seat fully against each other to provide a
proper explosionproof joint.
If your product was supplied with a sheet metal terminal housing, be sure to
read the D2L installation with sheet metal terminal enclosure (D2LBS/
D2LCS/D2LDS) instructions completely before beginning installation. If your
product was specified with alternate feed or no terminal housing, be sure
to read the alternate feed (suffix A) or no terminal enclosure (EPLBN/
EPLCN/EPLDN) installation instructions completely before beginning
installation.
To avoid the risk of explosion, do not add or enlarge conduit entries in cast
enclosures.
GENERAL INSTALLATION, MOUNTING &
LIFTING
1.
Select a mounting location that will provide suitable strength and rigidity for
supporting the panel board and all components.
Refer to Figure 1 for mounting dimensions and approximate weights. Note:
Refer to Field Installable Kits - Section E if you are using an EPLA MTG KIT
or D2LS MTG KIT installation.
2.
Install detachable mounting feet while enclosure is on the floor or work
bench.
Insert wedge shaped mounting feet into dovetail on all cast enclosures.
Standard D2LBS, D2LCS or D2LDS
Standard D2LBA/D2LCA/D2LDA or EPLBA/EPLCA/EPLDA
IF 1316 • 12/19
WARNING
WARNING
NOTE
WARNING
FIGURE 2 - LIFTING DIAGRAMS
Copyright © 2019, Eaton's Crouse-Hinds Division
3.
Use dedicated lifting eye to mount enclosure on suitable mounting surface.
Refer to Lifting Diagrams (Figure 2) for appropriate lifting procedure.
4.
Align enclosure with the two left side mounting feet on selected mounting
surface. While continuing to support the enclosure in position, install the
right two bolts of breaker enclosure. Securely tighten all bolts around
breaker enclosure. If a terminal housing has been supplied, securely fasten
four remaining bolts for that enclosure after breaker housing is fastened.
Note: There is a distance between terminal and breaker enclosure
mounting surfaces. Do not bend or distort union assemblies. Provide
adequate mounting or use available mounting kit.
To avoid the risk of explosion, all unused conduit openings must be closed
properly with an approved plug, drain or breather such as Crouse-Hinds
series PLG plugs or ECD breather/drains.
Division 1 panels with conduit runs 2" and higher require sealing fittings
installed within 18" of enclosure.
5.
With panelboard securely fastened to the mounting surface, remove plastic
plugs from desired entries.
6.
After enclosure is positioned and secured in its permanent location, pull
wires into panelboard terminal enclosure, making sure that they are long
enough to make the required connections.
7.
Make sure all screws and bolts are tightened to the appropriate torque
values found in Chart 1 below.
D2L INSTALLATION WITH SHEET METAL
Chart 1 – torque requirements
Item description
Power terminals (A, B, C)
100 amp branch terminals (1, 3, 5)
50 amp branch terminals
Ground/neutral strip
Ground/neutral and chassis lugs (3/8")
Quicklag breaker wire terminals
'F' frame breaker wire terminals
Breaker to bus screws (#10)
Circuit breaker body ground lug
D2L-S terminal cover screws
D2L-S gland plate screws
D2L-S ground stud
1/2" enclosure cover bolts
5/16" hinge screws
All inverted panels with terminal housings
2 FT
.61 m
Note: For all inverted panels, prior to lifting with eye, place on a 2 ft. (0.61m)
staging surface that can withstand the approximate weight of the panel. Panel
weights are listed in Figure 1.
WARNING
Wire range
Torque req.
4-4/0
74-83 in.-lbs. (8.4-9.4 N-m)
6-0
21.8-26.1 in.-lbs. (2.5-2.9 N-m)
24-8
7.1-8.9 in.-lbs. (0.8-1.0 N-m)
14-10
35 in.-lbs. (4.0 N-m)
8
40 in.-lbs. (4.5 N-m)
6-4
45 in.-lbs. (5.1 N-m)
2-1/0
50 in.-lbs. (5.7 N-m)
6-350 MCM
375 in.-lbs. (42.4 N-m)
14-10
20 in.-lbs. (2.3 N-m)
8
25 in.-lbs. (2.8 N-m)
6-4
27 in.-lbs. (3.1 N-m)
3-1/0
45 in.-lbs. (5.1 N-m)
3-4/0
50 in.-lbs. (5.7 N-m)
N/A
28-32 in.-lbs. (3.2-3.6 N-m)
4
120 in.-lbs. (13.6 N-m)
N/A
35 in.-lbs. (4.0 N-m)
N/A
18 in.-lbs. (2.0 N-m)
N/A
35 in.-lbs. (4.0 N-m)
N/A
40-45 ft.-lbs. (54.2-61.0 N-m)
N/A
25-30 ft.-lbs. (33.9-40.7 N-m)