Scope Of Supply; Visiano 20-2 C T1; Visiano 20-2 P Tx; Assembly Of Visiano 20-2 C T1 - Derungs Dmed VISIANO 20-2 C T1 Mode D'emploi

Masquer les pouces Voir aussi pour Dmed VISIANO 20-2 C T1:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 27
2

SCOPE OF SUPPLY

2.1

VISIANO 20-2 C T1

1x ceiling bracket (inner surface of B)
A:
1x ceiling cover
B:
1x end ring
C:
1x ceiling tube incl. cable
D:
1x light with adaptor (pre-assembled)
E:
2.2

VISIANO 20-2 P TX

1x light
1x power cable
3
ASSEMBLY of
VISIANO 20-2 C T1
3.1

Load data

Bending moment M
B
Vertical weight F
G
3.2

Attaching the ceiling bracket

DANGER
Assembly by qualified personnel
Assembly must be carried out by qualified
personnel only. Lack of appropriate knowledge
could be life-threatening.
DANGER
Life-threatening danger from falling light.
The ceiling must be made of solid concrete to
guarantee a secure hold.
DANGER
Electric shocks are life threatening
It must be possible to separate the light from
the mains by an external all-pole switch
(not included).
DANGER
Electric shocks are life-threatening
Voltage supply from the power connection
must be protected on all poles by means of an
overcurrent release (according to national
installation requirements; it is not included in
the scope of supply).
Pay attention to the minimum distance of the
ceiling tube!
Saw ceiling tube to the desired length at the top
end using a metal saw and deburr.
Remove fastening screw.
ENG
25Nm
90N
19

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Dmed visiano 20-2 p txDmed visiano 20

Table des Matières