Preliminary Checkings; Installation Layout - V2 AZIMUT Mode D'emploi

Actionneur électromécanique 24vdc pour portes sectionnelles et basculantes à ressort jusqu'à 2,25 m de haut et basculantes à contrepoids jusqu'à 2,45 m, surface maximum 8 m2
Masquer les pouces Voir aussi pour AZIMUT:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 29

PRELIMINARY CHECKINGS

Before installing AZIMUT, please check the following basic points:
• The door must be suitable to be automated (check the door
operation manual and directions). The door structure itself
must be stout and appropriate to be automated.
• Fix the engine steadily and using suitable material.
• If necessary, make the structural calculation and enclose to
the technical specification paper.
• Check the door to be provided with anti-fall system
(independent of the suspension system)
• The door must be functional and safe.
• The door must open and close easily without any friction.
• The door must be properly balanced both before and after its
automation: stopping the door in any position, it must not
move (carry out a balance weight adjustment, if necessary).
• It is advisable to install the geared motor in the centre of the
door; it is permitted to move aside 100 mm to install the
sliding arm accessory J4 (see paragraph 2.7 page 14).
• In case of counterbalanced door, check that the minimum
distance between the track and the door must not be under
20 mm.

INSTALLATION LAYOUT

Actuator AZIMUT
Photocells
Schuco socket
15
cable con spina 2 x 0.75 mm
2
cable 4 x 1 mm
2
(RX)
cable 2 x 1 mm
2
(TX)
-

Publicité

Table des Matières
loading

Table des Matières