Operation; Preparation - Wohler Rm 400 Instructions De Service

Table des Matières
Les langues disponibles

Les langues disponibles

Operation

5
Operation
5.1

Preparation

Fig. 3: Control switch
Fig. 4: Fixing the drill head with the snap-
lock
Fig. 5: Releasing the snap-lock to sepa-
rate the drill head from the cable.
30
Make sure that the control switch is set to
OFF.
Select an appropriate auger and securely
connect it to the cable with the snap-lock.
To release the snap-lock after cleaning, insert
the coupling key into the hole. The coupling
key is included in the scope of delivery.
Then pull the snap-lock apart with two hands.
Table des Matières
loading

Table des Matières