Operation
5
Operation
5.1
Preparation
Fig. 3: Control switch
Fig. 4: Fixing the drill head with the snap-
lock
Fig. 5: Releasing the snap-lock to sepa-
rate the drill head from the cable.
30
Make sure that the control switch is set to
•
OFF.
Select an appropriate auger and securely
•
connect it to the cable with the snap-lock.
To release the snap-lock after cleaning, insert
•
the coupling key into the hole. The coupling
key is included in the scope of delivery.
•
Then pull the snap-lock apart with two hands.