GE AEE24 Mode D'emploi page 10

Masquer les pouces Voir aussi pour AEE24:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation Instructions
3. PREPARE THE AIR
CONDITIONER (cont)
E. Remove the shipping screws located on the
top of the case.
F. Remove the ground screws from each side of
the case. Keep them in a safe location.
NOTE: Be sure to save the ground screws.
You will need them later in the installation.
G. Slide the air conditioner from the case by
gripping the base pan handle, lifting up on the
air conditioner, and pulling forward. Have a
second person brace the case. Do not pull or
lift on the styrofoam discharge area.
H. Your unit may come with internal packaging.
This packaging must be removed prior to
installing the air conditioner back into the
cabinet.
10
4. PREPARE THE CASE
NOTE: Attach curtains to the air conditioner before
placing the air conditioner in the window.
A. Attach the top rail gasket to the bottom of the top
B. Install the top mounting rail with 4 type A screws
C. Slide each side rail onto the edge of each
Do not pull
or lift in
this area—
damage to
the unit may
result
FRONT
D. Slide the left and right accordion panels into the
Bottom mounting rail
mounting rail.
from the inside of the case. Press firmly to drive
the screws into the gasket and through the top
mounting rail.
Top mounting rail
according panel. The figure shows the
orientation of each accordion panel and side
retainer assembly relative to the case from a top
view of the unit.
Side Rail
Window Filler Panel
Side Rail
Window Filler Panel
top and bottom mounting rails.
Top left
Top right
49-5000552 Rev. 0

Publicité

Table des Matières
loading

Table des Matières