Télécharger Imprimer la page

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 49
ENGLISH

5.0 Mounting

NB: The base must be level. Max. 1 mm/m tolerance. This is extremely
important to ensure that the rest of the installation is correct.
All stones must be level. This has to be checked for each new
layer of stones. If necessary use small pieces of steel or silicon
to adjust the height of the stones.
Important!
Bear in mind that the stones may be damaged if they are
handled roughly. Do not knock the mounting brackets too hard.
Installation should be carried out by a qualified person.
Fig. 4
Necessary tool during mounting.
Spirit level, allen key, folding ruler, wrench, rubber mallet and
hammer.
Fig. 5
A
1. Remove the heat shields by unscrewing the two screws,
M8x20 mm, on either side (Fig. 5 A) of the burn chamber.
44
Fig. 6
ca 35 mm
C
Lay the burn chamber carefully down on its back (Fig. 6). You
1.
can put the cardboard packaging on the floor to protect it
from scratches, etc.
Adjust the length of the 3 legs by loosening the bolt (Fig. 6
2.
A). Pull the leg down to position «6» (Fig. 6 B) and fasten
the bolt firmly again.
Screw the foot screws (Fig. 6 c) through the foot. Adjust
3.
lenght to approx. 30 mm.
4.
Stand the product carefully up.
Fig. 7
C
Install the accompanying gasket (Fig. 7 A) on the underside
1.
of the edge of the smoke bell in the gasket channel.
2.
Install the smoke bell from outside by fixing it in place using
the four accompanying M8x20 mm screws and washers
(Fig. 7 B).
Rotate the smoke bell to the correct position (Fig. 7 C).
3.
Tighten the screws.
B
A
B
A

Publicité

loading