Heating System; Auxiliary Connections - Rizzoli ST Série Manuel D'utilisation

Masquer les pouces Voir aussi pour ST Série:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

2.11
BEFORE USING THE THERMAL COOKER
Before starting to use the thermal cooker,
remove the packaging materials in the oven,
remove the plastic film in which is wrapped
3.1
GENERAL NOTES
ST thermal cookers are endowed with boiler
to use the heating produced by the device
through a system with fluid vector for heat-
ing and for the production of hot water.
The system must be designed according to
UNI 10412-2:2006 law by a qualified thermal
technician and must be installed by experi-
enced people according to existing laws in
particular to UNI 10683:2005 law.
The thermal cookers are endowed with all
3.2
CONNECTIONS TO THE HEATING SYSTEM
Before the lighting of the thermal cooker
it is necessary to make the connections to
the heating system. The use of the thermal
cooker with empty or not connected to the
system boiler causes the irreversible damag-
3.3

AUXILIARY CONNECTIONS

According to the system you want to in-
stall, there are some auxiliary connectors
for facultative use, but sometimes necessary.
These are the connectors for the thermal di-
3.4
THERMOSTAT
ST thermal cookers are not endowed with
thermostat. If you want to create a forced
circulation based heating system it is neces-
sary to use an external thermostat to control
the working of the circulation pump of the
system, according to the temperature of the
water in the boiler. The thermostat detector
WARNING! For a longer duration of the boiler of the thermal cooker, you must
not make circulate the water with temperatures lower than 55-60° C. Lower tem-
peratures generate acid condensation and gas-black on the walls of the boiler.

3. HEATING SYSTEM

69
the plate and remove with a rag the most of
the oil on its surface.
the necessary predispositions for a correct
installation, every external component (as
pumps, valves, acoustic alarms, manometer
and thermostat) must be obtained by third
parts according to the specifies of designer
and installer.
ing of the boiler itself.
Anyway, it is necessary to connect the go-
ing connector, the return connector and the
discharge connector (necessary to empty the
boiler in case of maintenance).
scharge circuit, the connector for the detec-
tor of thermal discharge valve and the con-
nector for the thermostat. If not used, these
connectors must be covered.
must be inserted in the apposite connector
on the back of the thermal cooker. He ther-
mostat must activate the pump when the
temperature of the water is higher than the
set temperature and must keep it stable lo-
wer than the set temperature.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

St 60St 90

Table des Matières