Télécharger Imprimer la page

GE JCSP42 Instructions D'utilisation page 7

Masquer les pouces Voir aussi pour JCSP42:

Publicité

Installation Instructions
Installing the Anti-Tip Bracket
C
Locating the Bracket
C1
a. Decide whether the bracket will be
installed on the right or left side of the
range opening.
b. Place the bracket as shown in Fig. 1.
Adjacent
Cabinet
FLOOR–WOOD
Bracket
Side
Rear
Leveling Leg
FLOOR–CONCRETE
FIG. 1
Wall
Installing the Bracket in
C2
Wood or Concrete
INSTALLATION—WOOD CONSTRUCTION
a. Locate the centers of the 4 holes identified
in Fig. 1 as Floor–Wood and Wall.
b. Drill a 1/8" (3 mm) pilot hole through the
pre-marked areas. Note the angle of
the wall screw in Fig. 2.
c. Mount the Anti-Tip bracket with the
4 screws provided.
To Front Edge
of Countertop
INSTALLATION—CONCRETE
CONSTRUCTION
a. For concrete installation, you will need two
1/4" x 1-1/2" (3 mm x 3.8 cm) lag screws
and two sleeve anchors.
b. Locate the center of the 4 holes identified
in Fig. 1 as Floor–Concrete and Wall. Drill
the recommended size holes in each.
c. Install the sleeve anchors into the predrilled
concrete holes and install the lag and wall
screws through the Anti-Tip bracket. Make
sure the screws are securely tightened.
7
FIG. 2
63.5 cm
(25")
Bracket
Wall Plate
Screw Must
Enter Wood
or Metal

Publicité

loading

Ce manuel est également adapté pour:

Jcs968Jcs905