6401553.book Seite 22 Montag, 10. September 2012 2:27 14
4 Preparation
22
Operating Instructions BA ULTIMATE POWER + / BA ULTIMATE
4
Preparation
Preparation
4.1
Initial start-up and longer breaks in use
➢ Sterilize the instrument and accessories prior to startup.
➢ Clean and maintain the instrument after longer breaks in use.
4.2
Prior to starting the work day
➢ Purge the water paths and air channels for 20 - 30 seconds.
64 01 553 D3551.201.03.01.02