Assemble; Recommended Installation Sequence; Assemble Conveyors; Attach Mounting Brackets - Dorner MPB Serie Manuel D'installation

Convoyeurs en aluminium
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Assemble

Conveyor MUST be mounted straight, flat and
level within confines of conveyor. Use a level
(Figure 2, item 1) for setup.
Figure 2
1
Recommended Installation
Sequence
For more detailed instructions on any
assembly or maintenance procedures, see
your Installation, Maintenance and Parts
Manual that is supplied with conveyor.
1.
Assemble conveyor (if required) (see "Assemble
Conveyors" on page 6).
2.
Attach mounting brackets to conveyor (if required) (see
"Attach Mounting Brackets" on page 7).
3.
Attach conveyor to stands (if required) (see "Attach
Conveyor to Stands" on page 8).
4.
Install return rollers on conveyor (if required) (see
"Install Return Rollers" on page 8).
5.
Install gearmotor mounting package (if required) (see
"Install Gearmotor Mounting Package" on page 9).
6.
Install guides (if required) (see "Install Guiding" on
page 10).
Dorner Mfg. Corp.
NOTE
Figure 2
NOTE
Aluminum Conveyors

Assemble Conveyors

1.
Locate and arrange conveyor sections by section labels
(Figure 3, item 1).
Figure 3
1
2.
On tension end of the conveyor, identified with
a label (Figure 4, item 1): On both sides of
conveyor, loosen and move cam tracking assemblies
(Figure 4, item 2) (if equipped) away from head plates,
then loosen fastening screws (Figure 4, item 3) and
push head plate assembly inward.
Figure 4
3
3.
Roll out conveyor belt and place conveyor frame
sections (Figure 5, item 1) into belt loop.
Figure 5
1
6
1
Figure 3
2
1
Figure 4
1
Figure 5
851-703 Rev. A

Publicité

Table des Matières
loading

Produits Connexes pour Dorner MPB Serie

Ce manuel est également adapté pour:

Mpb 7200Mpb 7300

Table des Matières