Install Guiding - Dorner MPB Serie Manuel D'installation

Convoyeurs en aluminium
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Assemble

Install Guiding

For more detailed instructions on any
assembly or maintenance procedures, see
your Installation, Maintenance and Parts
Manual that is supplied with conveyor.
A WARNING
To prevent injury, make sure all electrical
power sources have been disconnected
before performing any copoennt assembly or
adjustments.
1.
Insert each drop-in T-bar (Figure 18, item 1) into the
conveyor frame T-slot (Figure 18, item 2) by rolling it
into position as shown.
Figure 18
2
Dorner Mfg. Corp.
NOTE
1
Figure 18
2.
Evenly space the T-bars, on both sides of the conveyor
at distances no greater than 36 in. (915 mm) (Figure
19, item 1). Install mounting brackets and guiding as
required.
Figure 19
3.
After final positioning, be sure to tightly secure all
mounting hardware.
Figure 20
After installing guiding and before operating
conveyor, be sure to eliminate any potential
pinch points that may have been created. To
prevent injury, keep fingers and hands away
from pinch point areas while the conveyor is
running.
Aluminum Conveyors
10
1
Figure 19
Figure 20
A WARNING
851-703 Rev. A

Publicité

Table des Matières
loading

Produits Connexes pour Dorner MPB Serie

Ce manuel est également adapté pour:

Mpb 7200Mpb 7300

Table des Matières