Tylo Prime+1313/C Manuel D'utilisation page 8

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 61
Bench Top (Left Side):
• Install the left Bench Top by tucking the back of the bench under the heater guard. Push
Bench Top all the way to the Left Back Wall.
• The Bench Top should fit down flush from front to back. It may be necessary to use the
openings in the skirt to apply pressure forward or rearward on the skirt to allow the bench to
drop into place.
Electrical Connections (under bench - right side):
• Connect wire #4 from distribution plate to #4 from Back Wall harness.
• Connect wire #5 from the distribution plate to #5 from the Back Wall harness.
• Connect wire #6 from the Back Wall harness to the distribution plate wire #6.
• Connect wire R1 from the distribution plate to R1 from the Right Wall junction box.
3 Person Infrared Sauna Prime+ 1313C
Page 8
150612
Rev. 3

Publicité

Table des Matières
loading

Table des Matières