Tylo Prime+1313/C Manuel D'utilisation page 11

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 61
Ceiling (Box #1):
• Install Styrofoam packing squares on top of the Right & Left Wall panels. One block should be
placed in the front portion and one toward the rear portion of each wall. These will be used to
set the ceiling on.
• The ceiling can now be set in place on top of the Styrofoam blocks.
Once the Ceiling panel is lined up directly above the Wall panels; insert the wires harnesses
from the wall panels into the holes in the Ceiling panel.
Note: Position the cam locks on the top of the Left & Right Wall panels as shown above.
3 Person Infrared Sauna Prime+ 1313C
Page 11
150612
Rev. 3

Publicité

Table des Matières
loading

Table des Matières