Télécharger Imprimer la page

Kohler K-1168-GHW-0 Guide D'installation page 5

Publicité

Les langues disponibles

Les langues disponibles

Option 1
Support Blocks
2. Install the Bath
IMPORTANT! Use maximum 1/8" (3 mm) thick spacers under the bath rim to ensure that the rim does
not contact the deck.
NOTICE: Do not lift the bath by the piping or blower, or use the piping or blower for structural support
of the bath. To avoid damage to the bath, lift by the rim at the sides of the bath.
If the subfloor is not level, shim under the bath as needed.
Option 1: Install Using Construction Adhesive
NOTE: Some models come with support blocks; some models have molded supports.
Apply a generous amount of high-quality construction adhesive to the bottom of the support blocks
or molded supports. With help, carefully lift the bath into position.
Apply weight to the bath bowl until the adhesive sets.
Option 2: Using a Cement or Mortar Bed
NOTE: Do not use gypsum cement or drywall compound for this application, as they will not provide an
acceptable, durable bond.
NOTE: Lay plastic film on wooden subfloors if desired to prevent water absorption.
NOTE: The blower must rest directly on the subfloor. The blower should not be in contact with mortar.
Set the bowl area in 1" (25 mm) to 2" (51 mm) of mortar cement.
Apply weight to the bath bowl until the mortar sets.
Secure the Nailing-In Flanges (Alcove Units)
Drill a small pilot hole through the nailing-in flange at each stud. Add shims as needed.
Use large-head galvanized nails to secure the nailing-in flange to the studs.
Nail furring strips to the studs.
Kohler Co.
Option 2
Apply construction
adhesive.
Alcove Installations
Clear a space
for the pump
and blower.
Stud
Furring
Strip
5
Cement or
Mortar Bed
Drill a small hole
through the nailing-in
flange at each stud.
Nail
1385106-2-B

Publicité

loading