Selecting the installation location
Before installing the SmartBox
available at the intended installation location (see page configuring the network
communication / device connection in the network / LAN).
Installation of the display unit
2.
Mount the display unit to the wall in a suitable position.
1. Open the display unit by removing the bottom cover.
2. After loosening the 2 screws, open the display unit by removing the cover.
3. Mount the display unit to a smooth vertical wall by means of dowels. Mount the housing
of the display unit by the four fixing holes with the enclosed screws and anchors.
Take care not to damage the housing.
4. After connecting the terminals and setting the unit up, replace the covers.
Installing the level probe
See assembly and operating instruction "Level probe".
Installing the probe
See assembly and operating instruction
„FSA-W 4-20 mA level gauge for SmartBox
ELECTRICAL INSTALLATION see corresponding instruction
„FSA-W 4-20 mA level gauge for SmartBox
part no. 28 410 57 a
SmartBox
®
, you have to check whether a free network connection is
1.
®
4 LAN / SmartBox
®
1 – 4".
®
1 – 4".
®
4 LAN PRO
5 / 28