WARNING for USA ONLY
DO NOT USE CELLULAR CORE PIPE
ONLY 3" PIPES ARE PERMITTED
When using venting material other than the boiler's manufacturer's venting, note the correct installation
procedure:
A total of 39 in (1 meter) of straight exhaust vent must be used before transition to ABS/PVC vent material.
First 1.0 meter / 3.28 ft. of vent use
polypropylene pipe (*)
HT Boiler
3.93 in
100.0 mm
Fig. 16
(*) accessories supplied by the boiler's manufacturer
INSTALLATION AND SERVICING INSTRUCTIONS
polypropylene to ABS coupling (*)
3" two pipe vent system
2.36 in
60.0 mm
23
Through the wall 1.64 ft (50.0 cm)
polypropylene vent (*)
Polypropylene to ABS couplings (*)
7.87 in
2.36 in
60.0 mm
200.0 mm
Vent
terminals (*)
min. 4.72 in / 120.0 mm
7109741.01 - en