Before, During, And After The Dive - Seac Sub PRO 2000 ADV Instructions

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

ENGLISH
Drawing 21
Blocking the shoulder straps
Drawing 22
Blocking the straps positioned over the
main strap

Before, during, and after the dive

Once on the surface, begin your dive by
deflating the bag; you will have three
possibilities:
1) By holding the Air Control power inflator
and pushing the grey button on the upper
part of the panel you will activate the upper
pneumatic overpressure valve, facilitating
the discharge of air. (Drawing 23).
40
Drawing 23
Opening of the upper valve by pushing
on the grey button
2) Hold the handle of the upper quick dump
valve on the right and pull it, or even pull
on the black tube of the cable: air will exit
the valve rapidly (Drawing 24).
3) If ever you find yourself upside-down, by
holding the Air Control power inflator and
pushing the lower part of the panel you
will activate the upper pneumatic
overpressure valve, facilitating the
discharge of air. (Drawing 25).

Publicité

Table des Matières
loading

Table des Matières