Télécharger Imprimer la page

Valor H5 Serie Directives D'installation page 2

Plaque de fi nition en fonte et ensemble pare-étincelles et portes utilisez avec les foyers valor 1100 et 1150

Publicité

Les langues disponibles

Les langues disponibles

Installation
1. Identify left and right hand lead-in brackets; position
and secure them to rear face of casting using 8 fl at
washers and screws provided.
2. Locate and secure top piece to rear face of casting
using 3 fl at washers and screws provided.
3. Position and secure heatshield to top piece using
4 screws; ensure shield protrudes through front of
casting.
Heatshield
Front face of
plate showing
heatshield
2
Top piece
4. On completion of fi replace installation, screw
the linerbox bracket to top face of fi rebox with 3
screws.
5. Carefully position cast plate to fi rebox and secure
with 4 low profi le screws; before tightening, hold
plate up against wall fi nish then tighten.

Publicité

loading

Ce manuel est également adapté pour:

1145cbp1145bdk