Maintenance; Replacing The Led Floodlight - BADU JET Vogue Instructions D'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 122

Maintenance

8
Maintenance
NOTICE
Before maintenance work, close all shut-off valves and drain
all pipes.
When?
Regularly
If there is a chance
of frost
After completing all maintenance work, perform all necessary
measures for start-up. See point 6.1 on page 43.
Due to the various water components the parts made of stainless
steel have to be cleaned periodically to avoid possible corrosive
damage.
8.1

Replacing the LED floodlight

Fig. 29
50 EN
What?
Remove foreign matter from the
suction opening.
Turn the motor shaft (after long idle
periods).
Tighten the screws.
Drain pump and pipes sensitive to
frost in good time.
A
B
WG23.70.051-P
08|2018

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Jet vogue deluxe

Table des Matières