Mounting Instructions - ABB i-bus Busch-Wachter Master 220 HGL EIB Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 40

Mounting Instructions

• For cable entries from below or top remove one of the
knockout wire lead-in points provided on the unit (Fig.2,
Item 1a ... d).
• Now mount one of the two cable glands in this entry
position.
• In the installation box (Fig. 2, Item 1) pierce one seal
(Fig.2, Pos.1a ... d) using a blunt cable end.
• Insert the round cable.
• Connect the unit.
• Make sure the installation box is mounted in «top»
mounting position.
• Secure the installation box via the bores provided in
the box on a solid structure at a height of approx. 2.5
m. Only use fillister head or round head screws (head
diameter 7 mm).
• Push the enclosure (Fig.1, Item 2) onto the installation
box (Fig.2, Item 1) with setscrews pointing downwards.
• Secure the enclosure by tightening the screw (Fig.2,
Item 3).
GB

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

6176/01 agm-204-500Gj b000 6132 a0126

Table des Matières