Safety Information; Preparation - OVE ADENA Mode D'emploi

Masquer les pouces Voir aussi pour ADENA:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

SAFETY INFORMATION

Please read and understand this entire manual before attempting to assemble, operate or install the
product.
• Handle the tempered glass with caution! Improperly handling the glass can cause it to break
suddenly in small pieces (never in pointed fragments).
• You will need at least two people to install this unit properly.
WARNING
• OVE is not responsible for any damage to the unit or personal property caused by improper
installation. If you disregard instructional warnings, you will void your warranty and possibly
deal with water damage.
CAUTION
• Carefully remove product from packaging and keep packaging until installation is complete.
• Inspect all parts for damage; if there is damage to the unit prior to installation, please contact
your distributor.
• Install the shower on a floor that is level and able to accommodate the weight of the unit and
an occupant.
• Please, consult local building codes and compliance standards prior to installation and ensure
conformity.

PREPARATION

Before beginning assembly of product, make sure all parts are present. Compare parts with package
contents list and hardware contents list. If any part is missing or damaged, do not attempt to
assemble the product.
Estimated Assembly Time: Shower tray (60 min), glass panels (60min).
Tools Required for Assembly (not included):
Screwdriver, Drill, 1/16" & 1/8" Drill bits, Silicone, Rubber mallet, Tape measure, Level,
Adjustable tool, Pencil, Heavy duty cutter, Safety glasses
6

Publicité

Chapitres

Table des Matières
loading

Table des Matières