GB
Vertical model
52
1
Place the wall-mounting frame on
the floor. Mark the drilling points A.
These points give the position of the
lower attachments.
Drill the 4 holes and insert the appropriate inserts for your wall (for example
3
plasterboard, concrete).
Put the wall-mounting frame into place and screw it into position.
User's manual
2
NOTE: For a vertical radiator, remember to leave packing
under the radiator until it has been put into position on
the wall-mounting frame.
Lift the wall-mounting frame making
the previously marked points coincide
with drilling holes A.
Mark the 2 drilling points B using a pen.
You will then have marked the 4 drilling
points.