Binzel Abicor iSTM Mode D'emploi page 41

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

iSTM
3 Clean the ABIROB
4 Grease the O-rings (3), (4) with sealing grease (included in the scope of delivery).
5 Mount the O-rings (3), (4) onto the size cylinders (5).
6 Mount the balls (6), pressure springs (2) and size cylinders (5).
7 Dismount the set screw (1) and gas guide (8) and check them; if necessary replace and
remount them.
After the
NOTICE
Carry out a functional check after mounting the iSTM mount.
• Mounting the cable assembly
• Switching on the recirculation cooler
• Carrying out a tightness check (visual check for coolant loss)
9.3 Cleaning the wire guide
 Fig. 10 Mounting the wire guide on page EN-16
During maintenance and cleaning, check the O-ring (6) for damage and replace it if necessary.
10 Troubleshooting
DANGER
Risk of injury and machine damage when handled by unauthorized persons
Incorrect repair work and changes of the product may lead to significant injuries and
machine damage. The product warranty will be rendered invalid if the unit is handled by
unauthorized persons.
• Only qualified personnel are permitted to perform work on the device or system.
NOTICE
• If the measures described below are not successful, please consult your dealer or the
manufacturer.
• Consult the documentation for the welding components.
BAL.0150 • 2020-08-03
®
W (7)iSTM mount with compressed air.
10 Troubleshooting
EN - 19

Publicité

Table des Matières
loading

Produits Connexes pour Binzel Abicor iSTM

Table des Matières