Putting Out Of Operation - Binzel Abicor iSTM Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

7 Operation
6.6 Mounting the wire guide
1
7
6
1
Collet
2
Nut
3
Cable assembly
Fig. 10
1 Slide the collet (1) with the wire guide (6) into the central connector (4).
2 Screw the retaining sleeve (7) on the thread side into the central connector (4) and tighten it.
3 Attach the cable assembly (4) to the central connector (4) using the nut (2).
6.6.1 Securing the wire guide
NOTICE
• The sight bore in the collet (1) serves for controlling the wire guide position.
1 Screw the collet (1) onto the wire guide (6) as far as it will go.
7 Operation
Due to the fact that the iSTM is integrated into the welding process of the torch, the operating
steps are performed after the respective torch has been put into operation. Please observe the
operating instructions of the respective ABIROB

8 Putting out of operation

Putting out of operation depends on the respective welding torch.
Please observe the operating instructions of the respective ABIROB
welding torches.
EN - 16
2
5
4
yCentral connector
5
Wire guide
Mounting the wire guide
3
4
6
O-ring
7
Retaining sleeve
®
®
A andABIROB
W welding torches.
®
BAL.0150 • 2020-08-03
iSTM
®
A and ABIROB
W

Publicité

Table des Matières
loading

Table des Matières