Embedding The Tubing And Wiring - Panasonic CS-ME7NKE Instructions D'installation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 41
G
install the indoor unit more than 1 meter away from any
antenna or power lines or connecting wires used for
television, radio, telephone, security system, or inter-
com. Electrical noise from any of these sources
may affect operation.
G
install in a sturdy manner to avoid increased operat-
ing noise.
Table 3
Max. Allowable
Tubing Length
Model
per unit
(m)
&8(1%(

* If total tubing length becomes 45 to 80 m (max.), charge additional refrigerant (R410A) by 20 g/m.
No additional charge of compressor oil is necessary.

2-2. Embedding the Tubing and Wiring

G
Before beginning embedding installation work,
consult fully with agencies or offices related to the
building's foundation, construction, electricity, and
water.
G
Wait to make connections to the embedded portion.
Each connection step is described later in this
manual.
G
Securely cover the end of the embedded tubing to
prevent intrusion of dirt or moisture.
G
If an embedded tube is to be left for a long time, fill
the tube with nitrogen and seal both ends securely.
If a tube is left open for an extended time, moisture
in the air inside the tubing may condense into water
droplets, and lead to water contamination of the
refrigerant circuit.
G
In order to prevent insulation breakdown and ground
faults, do not allow wiring ends to come in contact
with rainwater, or be subjected to condensation or
dew.
G
Apply sufficient thermal insulation to the refrigerant
tubing and drain pipes.
Max. Allowable Total
Tubing Length
Total Tubing Length
at shipment
(L1+L2+L3+L4+L5)
(L1+L2+L3+L4+L5)
(m)
 /////
 /////
6
Limit of
Limit of Elevation
Difference
(H1, H2, H3, H4, H5)
(m)
(m)

Required Amount
of Additional
Refrigerant
*
(g/m)


Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Cu-5e34nbeCs-me9nkeCs-me12nkeCs-me18nkeCs-me24nke

Table des Matières