Wall Mounted Shelf Installation Overview
Determine your preferred configuration
1
before beginning assembly. (Page 10)
• Wall brackets must be fully
secured to studs using 1 lag bolt
each or to concrete wall using 1
concrete anchor.
• Read through the entire
instruction manual first before
beginning installation.
Install wall brackets & back perimeter
3
beams onto the wall at a determined
height. (Page 13-14)
Install the front perimeter beams and
5
angled cross supports. (Page 20-21)
Note:
If installing the Wall Mounted Shelf cables to the wall, start on page 11. If installing the Wall Mounted Shelf
cables to the ceiling, start on page 12.
Plan your Wall Mounted Shelf
2
installation location, determine
orientation and verify spacing of studs.
(Page 11-12)
Install the Pad Eye Plate and Side Beams
4
with Cable Assemblies. (Page 15-19)
Place the grid supports followed by the
6
steel grids to complete the Wall Mounted
Shelf installation. (Page 21-22)
9