NewAge Products Pro Serie Mode D'emploi page 15

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installing Pad Eye Plate
Option A: Wall Configuration
Wall Mounting: Measure and mark 35" vertically from the bottom of the Wall Mounted bracket
9A
(#6) to the top of the pad eye plate (#22) . Align the pad eye plate on the center of the stud and
the top of the eye plate below the level line and mark the wall for pilot holes.
Side View
Wall Mounted:
35"
Drill pilot holes into the solid wood
10A
using a 3/16" drill bit.
Side View
Wood
Stud
#22
#6
Warning:
Must bore into
3 inches of solid
wood for lag screw
(#24) to be fully
secured.
35"
Secure Pad Eye Plate (#22) to the
11A
stud or joist using two 3" Lag Screws
(#24), and a 7/16" socket.
Front View
15

Publicité

Chapitres

Table des Matières
loading

Table des Matières