Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

1.6 Operation Test

 Connect the UPS to the wall receptacle.
 Push on the Main Switch till the Green LED are lit and release the Main Switch,
then the UPS self-test is being performed. The UPS is in normal status, and the
Green LED is ON.
 Connect your computer equipment with sockets of the UPS and pull off the input
power cable of the UPS from the wall receptacle to check if the Green Line LED
is flashing every 10 seconds. Meanwhile, please check if alarm buzzer is beeping
(very 10 seconds).
 Try the field working condition by running some application programs on your
computer and repeating step.
 Check if the UPS is initiated properly to support continuous operation. Re-connect
the input power cable to the wall receptacle; the UPS will return to normal status
in a few seconds.
Plug the UPS into the wall outlet to charge the UPS for over
6 hours before using the UPS.
28

Publicité

Table des Matières
loading

Table des Matières