Commissioning

6.1

Before switching on

The wiring unit is mounted and wired as described in the instructions,
ƒ
directly on a motor clamping flange or
with the wall adapter on a suitable surface near the motor.
Connections with the mains, motor, holding brakes, etc. have been
ƒ
established.
The communication unit has been mounted and wired according to the
ƒ
scheduled application.
Input and output signals
Safe input
Fieldbus
(depending on the version, only optionally available)
If required, the basic settings for "local mode" have been carried out.
ƒ
DIP switch
Potentiometer
The drive unit has been mounted and screwed together.
ƒ
Use available control functions reasonably, e.g.
ƒ
Inhibit controller enable
Set speed adjustment to the minimum setting
Activate safety system
The use of a brake resistor has been checked.
ƒ
In the case of dynamic loads or difficult control conditions, the use of the
internal E84DZEW47R0001 brake resistor is always recommended for
devices E84DGDVB4024 ... 7524 (4 ... 7.5 kW).
EDK84DGDVBxxx4 DE/EN/FR/ES/IT 9−0
l
Commissioning
Before switching on
6
91

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

L-force 8400 motec

Table des Matières