Final Works; Preparing The Commissioning Procedure - Lenze E94 SHE Single Drive HighLine Série Instructions De Montage

Masquer les pouces Voir aussi pour E94 SHE Single Drive HighLine Série:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

8

Final works

Preparing the commissioning procedure

8
Final works
8.1
Preparing the commissioning procedure
You need the following for commissioning:
Keypad EZAEBK0001
ƒ
or
Computer with Windows® operating system (XP or 2000)
ƒ
Lenze PC software »Engineer«
ƒ
Connection with the controller via an interface, e.g.
ƒ
– Diagnostic interface X6 with USB diagnostic adapter
– System bus (CANopen)
– Communication module
Software manual for the technology application used
ƒ
The communication manual for the network of the automation platform
ƒ
Mains voltage or 24−V voltage supply for the control electronics of the controller
ƒ
Follow the instructions of the software and/or read the documentation.
86
l
EDK94SH104 DE/EN/FR/ES/IT 8.0

Publicité

Table des Matières
loading

Table des Matières