Thermador PROFESSIONAL VCIN JP Série Manuel D'installation page 24

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

c) Secure to the sides of the housing framework using
six (6) x 2" (50.8 mm) mounting screws, 3 per side
as indicated in Figure 27.
2" (50.8 mm)
mounting screws
X3 per side
7. Connect to ductwork
8. Connect electric
a) Remove the junction box cover (see Figure 5 on
page 11).
b) Remove circular knock-out holes located on back
side of the insert (see Figure 5 on page 11).
c) Connect wiring for applicable blower motor (see
blower instructions beginning on page 11).
d) Ensure all controls are in the OFF position. Plug
electrical cord into grounded outlet.
9. Install hood filters, filter spacers, and grease trays
a) Refer to "Installing Grease Trays, Filter Spacers,
and Filters" on page 28.
10. Test the installation
a) Test the operation of the blower and the lights.
b) Be sure to check for backdraft. With the blower on
high, close the windows and doors to the area to
ensure that fan does not cause back drafting in any
outlet vent for another appliance.
English 22
Figure 27: VCIN Side Screws

Publicité

Table des Matières
loading

Table des Matières