Starting The Blast Chiller - Finarome AT03ISO Notice D'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

It is necessary that the power supply cable section is adequate to the unit power consumption.
The earthing of the appliance is compulsory in conformity with the law. Therefore it is
necessary to connect it to an effi cient earthing system. If the power supply cable was damaged, it
must be substituted by the technical qualifi ed staff. It is strongly recommended to avoid the use
of electrical appliance inside the blast chiller compartment.
If the compressor is damaged, it must be replaced exclusively by qualifi ed staff, in order to pre-
vent any risks. In case of breakdown we suggest to unplug the appliance and to use a high sensitivity mag
thermic anti-electrical shock switch.

2.2 STARTING THE BLAST CHILLER

ATTENTION
The fi rst start up must be carried out by qualifi ed staff.
Before switching on the blast chiller, be sure that:
Your hands must be dry
The surface of the blast chiller must be dry
The fl oor and the electrical socket must be dry
Furthermore, be sure that:
The build in condensing unit blast chiller must be carried only in upright position. If it had leaned, we
recommend to wait at least 8 hours before proceeding with the start so that the oil will fl ow in all the
components, lubricating them again.
For the temperature setting make reference to the corresponding chart about product categories/ usage tem-
perature, in addition For the working parameters regulation refer to the user instructions of the control panel
enclosed to this current manual.
Once the blast chiller is connected with the power cable (see the previous paragraph), proceed po-
wering it with the switch closing.
For the built in unit, before plugging it in, verify that the selector is open in 0, OFF or green position. Insert the
socket and then turn off the switch. Before placing inside the food to be chilled or frozen, it is necessary to clean
the chamber of the appliance (see chapter about cleaning) and afterwards it will be required to chill in advance
the chamber before starting the positive or negative processes.
For regulating the functioning parameters consult the instructions for the instrument panel enclosed to the
current manual.
Blast chillers | User and maintenance manual | EN
31

Publicité

Table des Matières
loading

Table des Matières