Preparation - Sonnenkonig WARMEPILZ RATTAN Mode D'emploi

Chauffage extérieur
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3 Preparation

Before you start assembling the product, make sure that all parts are present. Compare the parts
EN
with the package contents list and hardware contents above. If any part is missing or damaged, do
not attempt to assemble the product. Contact customer service for replacement parts.
Estimated assembly time: 60 minutes
Tools required for installation (not included): Phillips screwdriver and leak detection solution.
Connect the two components (F and G) with each other using the M6*20 screw (3). Align the
1.
upper component so that the holes of both parts match.
2.
Open the pre-assembled door in the base and connect the gas hose
to the safety valve.
3.
Remove the regulator (optional) from the gas hose and feed the
hose through the rod (E).
Fasten the burner (C) to the rod (E) with M6*20 mm (4) screws.
Note: The end of the rod is marked with the sticker „F" (front) and
should be in the same direction as the control panel.
4.
To insert the battery (not supplied) into the detonator, unscrew the
detonator cover counterclockwise. Now insert the battery (AAA)
into the hole in the specified orientation.
54

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

30310388

Table des Matières