Assembly Of The Air Ducts And External Grids; Preparing The Holes On The Unit; Fitting The Unit On The Bracket - Olimpia splendid MAESTR SMART Directives D'installation, D'utilisation Et D'entretien

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

2.4.3 -
ASSEMBLY OF THE AIR DUCTS AND EXTERNAL GRIDS (fig.10-11-12)
After having drilled the holes, insert the plastic sheet supplied with the conditioner into them. Since the
sheet was made for 200 mm/8" holes, the installer will have to trim 129 mm/5.1" from the long side of
the sheet if using 160 mm/6.4" holes.
the length of the sheets must be 63,5 mm/2.5" less than the thickness of the wall. roll the sheet and
insert it into the hole. Pay attention to the splicing line (G) which must always face upwards.
to position the external grids, proceed as follows:
a. Apply the seal (D) to the wall flange (F), ensuring it lines up with the outer edge of the flange as indicated
in the figure 13.
b. Fix the two flanges using 2 pegs having a diameter of 6 mm-1/4" and check that the two fixing holes are
horizontal.
c. Fit the small eyelet of the spring, with the long stem, on the cap pin, on both components. (fig. 17)
d. insert the two caps (with spring), on the front part of the external grid, on its two housings, pulling until
it clicks (fig. 18) and couple the two chains to the large eyelet of the spring.
e.
Using one hand, grip the two chains connected to the grid.
f. Bend the external grids back, gripping them with your free hand where they bend and insert your fingers
inside the single fins (fig. 19).
g. insert your arm into the pipe until the grid protrudes completely outwards. reopen the grid, being careful
to keep your fingers inside the fins.
h. Turn the grid until the fins are fully horizontal and tilted downwards.
i.
Pull the chain, tensioning the spring, couple the chain ring to the pin of the inner flange through which
the pipes pass (fig. 20).
l.
Use hand shears to cut off any excess chain links.
Olympia Splendid recommends using the supplied grids, or grids with similar charac-
teristics.
2.4.4 -

PREPARING THE HOLES ON THE UNIT

the unit was built to be paired with 165 mm/6.4" pipes so to ensure the best performance and lowest noise
level, you should use the 200 mm/8" holes. if using the 200 mm/8" pipes use a cutter to punch an opening
on the rear cover and remove the covering part (fig. 21).
2.4.5 -
FITTING THE UNIT ON THE BRACKET (fig.22-23-24-25)
after ensuring the mounting bracket is properly anchored to the wall and that all required preparatory work
has been carried out for the electrical connections and/or the condensate drainage the unit can be fixed to
the wall. lift it by holding it from the sides of the lower base.
to facilitate the operation of fastening it to the bracket, tilt it slightly toward you. to make the electrical con-
nection and fasten the drainpipe, place a wedge between the air conditioner and the wall.
When you have finished, inspect carefully to make sure there are no open sections at the back of the unit.
The insulating gasket must fit firmly against the wall, particularly in the zone where air enters and leaves the
unit.
USA - 9
MAESTRO SMART

Publicité

Table des Matières
loading

Table des Matières