Arjohuntleigh ALPHA ACTIVE 3 Manuel D'utilisation page 16

Masquer les pouces Voir aussi pour ALPHA ACTIVE 3:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 93
Make sure that the mains power cable is positioned to avoid
causing a hazard and is clear of moving bed mechanisms or other
possible entrapment areas.
Installing the Pump
System Operation
WARNING
The pump should be installed as follows:
1. Position the pump, feet down, on any convenient
horizontal surface or alternatively suspend from the
bed foot rail by means of the integral hanging
brackets.
2. Ensure that the mattress tube-set is not "kinked" or
twisted and connect it to the pump until it clicks
into place. Ensure that the tube-set is securely
connected to the pump.
3. Insert the mains power plug into a suitable mains
power socket.
The system is now ready for use. Refer to
Page 9 "Mattress - Pump Operation" for day-to-day
operating instructions.
6

Publicité

Table des Matières
loading

Table des Matières