< TEST OPERATION >
• After cleaning the indoor unit inside, carry out test operation
according to installation manual attached to the outdoor
unit.
• When the remote controller operation lamp flashes, it
shows that something is abnormal.
Check the malfunction codes on the remote controller.
The relation between the malfunction codes and
malfunction details is described in the operation manual
attached to the outdoor unit.
Particularly, if the indication is one of those shown in the
Table 7, it may be an error in the electrical wiring or the
power supply is disconnected. Therefore, recheck wiring.
Table 7
Remote controller
indication
Though the central-
The terminals (T1 · T2) for FORCED OFF
ized control is not
on the indoor unit trans mission terminal
carried out, the lamp
block is short circuited.
turns on.
The power supply to the outdoor unit is not
made.
The power supply work to the outdoor unit
[U4] displays.
is not carried out.
[UH] displays.
The transmission wiring and the remote
controller wiring and FORCED OFF wiring
are connected incorrectly.
The transmission wiring is disconnected.
The power supply to the indoor unit is not
made.
The power supply work to the indoor unit is
not carried out.
No indication
The remote controller wiring and the
transmission wiring and FORCED OFF
wiring are connected incorrectly.
The remote controller wiring is
disconnected.
• At test operation, if the decoration panel is mounted, check
the actuation of the swing blade.
CAUTION
After test operation is completed, check the items men-
tioned in Clause 2: 2. Items to be checked at delivery
on page 3.
If the interior finish work is not completed when the test
operation is finished, for protection of the air con ditioner,
ask the customer not to operate the air conditioner until
the interior finish work is completed.
If the air conditioner is operated, the inside of the indoor
units may be polluted by substances generated from the
coating and adhesives used for the interior finish work
and cause water splash and leakage.
To the operator carrying out test operation
After test operation is completed, before delivering the
air conditioner to the customer, confirm that the control
box lid, the air filter and suction grille are attached.
In addition, explain the power supply status (power sup-
ply ON/OFF) to the customer.