Installation Drawing; Installation Prepare; Selection Of Location - Tekno Point CNS-09 Manuel D'utilisation Et Installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation drawing

Embedded

Installation prepare

Tools
1 Level meter
4 Drill head
7 Open-end wrench
10 Vacuum pump
13 Inner hexagon spanner

Selection of location

Basic requirement
Installing the unit in the following places maycause malfunction. If it is unavoidable, please
consult the local dealer:
1. The place with strong heat sources, vapors, flammable or explosive gas, or volatile
objects spread in the air.
2. The place with high-frequency devices (such as welding machine,medical equipment).
3. The place near coast area.
4. The place with oil or fumes in the air.
5. The place with sulfureted gas.
6. Other places with special circumstances.
7. The appliance shall not be installed in the laundry.
Indoor unit
1. There should be noobstruction near air inlet and air outlet.
2. Select a location where the condensation water can be dispersed easily and won't affect
other people.
Wall mounted
2 Screw driver
5 Pipe expander
8 Pipe cutter
11 Pressure meter
3 Impact drill
6 Torque wrench
9 Leakage detector
12 Universal meter
14 Measuring tape
46

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Cns-12

Table des Matières