Tekno Point CNS-09 Manuel D'utilisation Et Installation page 55

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation of indoor unit
Clasp
4. Put wiring cover back and then tighten the screw.
5. Put back the cover and panel.
Note:
● All wires of indoor unit and outdoor unit should be connected by a professional.
● If the length of power connection wire is insufficient, please contact the supplier for a new
one. Avoid extending the wire by yourself.
● For the air conditioner with plug,the plug should be reachable after finishing installation.
● For the air conditioner without plug, an air switch must be installed in the line.
The air switch should be all-pole partingand the contact parting distance should be more
than 3mm.
Step 8: Bind up pipe
1. Bind up the connection pipe, power cord and drain hose with the band.
2. Reserve a certain length of drain hose and power cord for installation when binding them.
When binding to a certain degree, separate the indoor power and then separate the drain
hose.
3. Bind them evenly.
4. The liquid pipe and gas pipe should be bound separately at the end.
Note:
● The power cord and control wire can't be crossed or winding.
● The drain hose should be bound at the bottom.
indoor and
outdoor power cord
gas
pipe
liquid pipe
band
drain hose
Screw
Outdoor unit connection
connection pipe
indoor power cord
51
Clasp
Clasp
L
N
S
yellow-
green
drain hose
band

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Cns-12

Table des Matières