Step 4. Installing The Conduit - Samsung NE63 8 Serie Manuel D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Step 4. Installing the conduit

Remove the conduit connection plate and rotate it as shown below.
The conduit hole (1
1
") must be used.
8
1. Prepare the conduit cord as shown in Figure 1.
2. Install the conduit cord as shown in Figure 2.
Figure 1
"
3
1"
1"
8
3
"
3
1
1
2
2
3 wire
4 wire
Knockout surface
Conduit connection plate
For conduit installations, insert the strain relief (not included) into the conduit
hole (1
1
"). Then thread the conduit cord through the body of the strain relief and
8
fasten the ring. Reinstall the bracket.
Install_NE63T8911_AA_DG68-01257A-00_EN.indd 11
3
1
1
"
1
"
8
8
3
1
"
8
Figure 2
"
3
8
"
Strain relief
Installing a 3-wire conduit
Aluminum building wire may be used but it must be rated for the correct
amperage and voltage. Connect the wires as described below.
The wire you use, the location and enclosure of splices, etc., must conform to
good wiring practices and local codes.
1. Loosen the 3 lower terminal screws from the terminal block.
2. Insert the center bare wire (white/neutral) tip through the bottom center
terminal block opening. On certain models, the wire will need to be inserted
through the ground strap opening and then into the bottom center block
1
1
"
opening.
8
3. Insert the two side bare wire tips into the lower left and the lower right
terminal block openings.
4. Tighten the screws until the wire is firmly secured (35 to 50 inch-lbs.). Do not
over-tighten the screws since it could damage the wires.
5. Go to Step 5 on page 13 to continue with the installation.
Ring
Body
Neutral terminal
Live 1
Ground strap
White
Red
Black
Live 2
Wire tips
White
Black
Red
English 11
3/19/2020 4:15:02 PM

Publicité

Table des Matières
loading

Table des Matières