Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 35
ENGLISH
Follow these instructions.
1. Close the gas valve.
2. Remove the gas control knob (A).
3. Loosen the screws (B) and remove the
control panel (C).
4. Take out the injector D and replace it for a
new one which is appropriate for the used
type of gas (see attachment). After the
setting seal the screw.
5. Finally, reattach the control panel (C) and
the gas control knob (A)..
After completing all calibration
and adjustment work, check the gas
installation for leakages and whether
the device operates properly.

Make sure that the flame is stable
GB
at
minimum
pressure
.
9.3.

Replacement of burner nozzles

Follow these instructions.
1. Close the gas valve.
2. Remove the gas control knob (A).
3. Loosen the screws (B) and remove the control
panel (C).
B
and
maximum
output
A
C

After adjustments, attach the prepared
sealing marks and/or seal calibration screws.
B
D
4. Remove the nozzle C and replace it with a
nozzle intended for the used gas (see table).
5. Finally, set the device to the initial status
D
14
A
C
ID 17

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ftg92ma1Ftg92mc1295504129550812955061

Table des Matières