Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation and connection
Installation planning
A
The illustration shows an example of a lighting system. Variations are possible.
• Only connect the LED spotlight to components with compatible connections.
• It is possible to add spotlights to the lighting system if a more powerful switching power pack with additional outputs
is used.
• Switching power pack requirements:
− Electronic switching power pack with DC decoupling between the primary and secondary side.
− Output voltage: 24 V DC
− Residual ripple: Max. 5 %
• Fastening of the LED spotlight:
LED spotlight
ProfiLux LED 350/01
ProfiLux LED 1100/01
ProfiLux LED Spot 2200/01
ProfiLux LED Flood 2200/01
• Caption
ProfiLux LED 350/01
ProfiLux LED 1100/01
ProfiLux LED Spot 2200/01
ProfiLux LED Flood 2200/01
Power Box 24 V DC (50493)
Connection cable 24 V DC:
1 m length (12762)
3 m length (12552)
7.5 m length (12553)
15 m length (11720)
Set-up the unit
Attention! Strong optical radiation from LEDs of the risk group 2.
Possible consequences: Damage to eyes.

Protective measures:

• Do not look into the spotlight directly or for a long time when it is on.
• Do not direct the spotlight at persons.
ProfiLux LED 350/01
Fitting to the Komet nozzle
How to proceed:
3.
0.
B, C
1. Using the mounting clamp, screw the spotlight firmly to the sleeve for Komet 10-12 or Komet 10-14.
− To ensure optimum fitting, use the Oase sleeve 10 (article number: 51018).
2. Loosen the Allen screws on both sides of the spotlight, align the spotlight and tighten both Allen screws.
Installing on a base
How to proceed:
3.
0.
B, D
1. Loosen the Allen screws on both sides of the spotlight and tilt the spotlight to allow access to the slot of the installa-
tion bracket.
2. Fasten the installation bracket to the ground/base.
3. Align the spotlight and tighten the Allen screws on both sides.
Fastening
To Komet nozzle 10-12 or 10-14
With installation bracket to a firm base
With installation bracket to a firm base
With installation bracket to a firm base
- GB -
13

Publicité

Table des Matières
loading

Table des Matières