Publicité

Les langues disponibles

Les langues disponibles

Liens rapides

GSQ-D SERIES
GSQ-D EC SERIES
DIRECT DRIVE GALVANIZED SQUARE INLINE BLOWER
OPERATION INSTRUCTIONS AND PARTS MANUAL
PLEASE READ AND SAVE THESE INSTRUCTIONS
GSQ-D SERIES MODELS: GSQ105-D, GSQ120-D, GSQ135-D, GSQ150-D, GSQ165-D, GSQ180-D
The purpose of this manual is to aid in the proper installation and operation of the blowers. These instructions are intended to supplement
good general practices and are not intended to cover detailed instruction procedures.
IT IS THE RESPONSIBILITY OF THE PURCHASER TO ENSURE THAT THE INSTALLATION AND MAINTENANCE OF THIS
EQUIPMENT IS HANDLED BY QUALIFIED PERSONNEL.
Inspect all shipments carefully for damage. THE RECEIVER MUST NOTE ANY DAMAGE ON THE CARRIER'S BILL OF LADING
AND FILE A CLAIM IMMEDIATELY WITH THE FREIGHT COMPANY.
GENERAL SAFETY
1.
All electrical work must be done in accordance with all applicable electrical codes by a qualified electrician.
2.
Prior to wiring ensure the power supply is locked in the OFF position and that the motor nameplate voltage matches the supply
voltage.
3.
Do not install or operate this fan in an environment where combustible materials, gases or fumes are present.
4.
Caution: the fan contains rotating parts and electrical service. Appropriate safety precautions should be taken during installation,
operation and maintenance.
5.
Before starting the unit, ensure the wheel rotates freely.
6.
Check and tighten where necessary all nuts, bolts & set screws prior to fan start up (as some may have loosened during shipment).
7.
Please follow all applicable national, state/provincial and local codes, all of them will supersede this manual.
8.
Failure to follow the safety instructions in this manual may cause serious injury or death due to electrical shock or high
speed rotating parts.
M_GSQ_D_06_16_2022
Page 1 of 5

Publicité

Table des Matières
loading

Sommaire des Matières pour Canarm GSQ-D Série

  • Page 1 GSQ-D SERIES GSQ-D EC SERIES DIRECT DRIVE GALVANIZED SQUARE INLINE BLOWER OPERATION INSTRUCTIONS AND PARTS MANUAL PLEASE READ AND SAVE THESE INSTRUCTIONS GSQ-D SERIES MODELS: GSQ105-D, GSQ120-D, GSQ135-D, GSQ150-D, GSQ165-D, GSQ180-D The purpose of this manual is to aid in the proper installation and operation of the blowers. These instructions are intended to supplement good general practices and are not intended to cover detailed instruction procedures.
  • Page 2: Dimensions

    GSQ-D SERIES GSQ-D EC SERIES DIMENSIONS *+,/#/$06#78$096#87:$6'&0;<&8#67=0%7=$#6+,>&8$67=%7=$6'%"<$8 !"#$% & &( *+,-.-/#/$0 !"#"$%&' !!#"$%&' !(#)*$%& !"#*$!%' *+,(-1/#/$0 !*#!$(' !&#"$(' +!#!$+' !"#)$(' !(#!"$!%' *+,(2-/#/$0 +&#)$(' !*#)$&' +!#!)$!%' *+,(31/#/$0 !(#)$&' +%#)$(' !-#!$+' +)#!)$!%' *+,(1-/#/$0 +&#!$+' +,#*$(' )(#)$(' +!#"$(' +%#"$!%' *+,(41/#/$0 +%#)$&' )!#!$(' +)#)$&' +(#-$!%' *+,(5-/#/$0 +-#"$('...
  • Page 3 GSQ-D SERIES GSQ-D EC SERIES STANDARD WIRING INSTRUCTIONS A qualified electrician in accordance with all local and National Electrical Codes should do all wiring. Ensure power supply is disconnected and locked out prior to making electrical connections. Excess wire must be restrained in order to prevent it from entering the pulley, shaft or wheel rotating area. Disconnect switches are recommended and should be located near the fan in order to, swiftly cut off power in case of an emergency and maintain complete control of the power source.
  • Page 4: Fan Trouble Shooting

    GSQ-D SERIES GSQ-D EC SERIES If your unit contains the ECsmart Motor please follow these wiring diagrams: PRE-START INSPECTION START-UP Turn the fan on and inspect for the following: Direction of rotation. Improper motor amperage. Excessive vibration. Unusual noise. If a problem is discovered shut off the fan and refer to the section on troubleshooting to discover the cause of the problem. The fan should be inspected after 30 minutes, 8 hours and 24 hours of operation to ensure all fasteners are tight and belts are properly tensioned and aligned.
  • Page 5 WARRANTY CANARM Ltd. warrants every new fan to be free of defects in material and workmanship to the extent that, within a period of one year from the date of purchase. CANARM Ltd. shall either repair or replace at CANARM’s option, any unit or part thereof, returned freight prepaid, and found to be defective.
  • Page 6 SÉRIES GSQ-D SÉRIES GSQ-D EC VENTILATEUR CARRÉ GALVANISÉ À ENTRAÎNEMENT DIRECT MODE D’OPÉRATION ET LISTE DES PIÈCES LIRE ET GARDER CES INSTRUCTIONS GSQ-D SERIES MODELS: GSQ105-D, GSQ120-D, GSQ135-D, GSQ150-D, GSQ165-D, GSQ180-D Le but de ce livret et de vous faciliter dans l’installation et l’opération de souffleurs. Ces instructions doivent complémenter des bonnes pratiques générales et ne sont pas conçus pour couvrir les procédures détaillées.
  • Page 7 SÉRIES GSQ-D SÉRIES GSQ-D EC DIMENSIONS +,-0#0&17,"899%&8:7&;7%<+;&71'::=7<;1%<;=7>&:,7%?'::<$:&7@7&;A:'B;&!&;A7#<:&1A !"#$%& +,-./.0#0&1 !"#"$%&' !!#"$%&' !(#)*$%& !"#*$!%' +,-).20#0&1 !*#!$(' !&#"$(' +!#!$+' !"#)$(' !(#!"$!%' +,-)3.0#0&1 +&#)$(' !*#)$&' +!#!)$!%' +,-)420#0&1 !(#)$&' +%#)$(' !-#!$+' +)#!)$!%' +,-)2.0#0&1 +&#!$+' +,#*$(' )(#)$(' +!#"$(' +%#"$!%' +,-)520#0&1 +%#)$&' )!#!$(' +)#)$&' +(#-$!%' +,-)6.0#0&1 +-#"$(' +"#)$(' )&'...
  • Page 8: Instructions De Câblage

    SÉRIES GSQ-D SÉRIES GSQ-D EC INSTRUCTIONS DE CÂBLAGE Tout le câblage doit être effectué par un électricien qualifié selon les Normes Électriques Nationaux et Locaux. Assurez-vous quel le courant est fermé avant de procéder au câblage électrique. Cependant, le fil en trop doit être retenu pour prévenir qu’il entre dans la poulie, l’arbre ou la roue en mouvement. Des interrupteurs d’arrêt sont recommandés et doivent être placés près du ventilateur afin de pouvoir les atteindre rapidement en cas d’urgence et ainsi maintenir un contrôle électrique.
  • Page 9: Inspection Avant Démarrage

    SÉRIES GSQ-D SÉRIES GSQ-D EC Si votre unité contient le moteur ECsmart, veuillez suivre ces schémas de câblage: INSPECTION AVANT DÉMARRAGE DÉMARRAGE Démarrer le ventilateur et inspecter les items suivants : 1. Sens de la rotation. 2. Ampérage erroné du moteur. 3.
  • Page 10: Garantie

    Canarm Ltée. garantie que tout nouveau ventilateur est libre de toute défectuosités dans les matériaux et lamain-d’œuvre, et ce pour une période d’un an à partir de la date d’achat. Durant cette période, CANARM LTÉE. réparera ou remplacera à la discrétion de CANARM, tout appareil ou pièce d’appareil, retournez à...

Table des Matières