TEUFELBERGER CECLIMB Mode D'emploi page 28

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 98
rEPlaCEmENT Of friCTiON HiTCH COrD (ValDôTaiN 4+4) aND sysTEm assEmbly
4) Install the second karabiner in the middle or top hole,
with the opening upward. Between the bite in the eye and
the constriction band, connect the eye termination of the
climbing line with the upper karabiner. Ensure the constric-
tion band on the eye termination is in close contact with
the load settling point of the karabiner. If necessary, spread
the legs of the eye termination to force the constriction
band into effective contact with the karabiner.
5) Before working at height, check that the grab function
of the friction hitch is reliable and that a controlled ascent
and descent is possible. Check that a small impact load is
effectively braked.


Publicité

Table des Matières
loading

Table des Matières