Maintenance And Care Of The Lift; Lift Maintenance Plan - Nussbaum POWER LIFT HL 2.60 SST DG Manuel D'exploitation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

7. Maintenance and care of the lift

Before maintenance, do all preparation work so there is no danger to life or limb
or object damage during maintenance and repair work.
Legal principles: BSV (operating equipment regulation) + BGR500 (Operation of work
equipment)
Value is placed on long lifetimes and safety in the development and production of Nussbaum
products. To guarantee the safety of the operator, product reliability, low running costs, keep
the warranty and also the long-lifetime of the product, proper set up and operation is just as
important as regular maintenance and sufficient care.
Our platforms fulfil TUV, BG and CE certifications and exceed all safety standards of the
countries we supply to. For example, European regulations require a service by qualified
experts every 12 months of work of the platform. To guarantee the largest possible
availability and functional capacity of the lift system, ensure the list of any cleaning, care and
maintenance work is done.
After first commissioning the lift is to be serviced at regular intervals of a maximum of one year
by an authorised person according to the following plan. For intensive operation and higher
degree of contamination shorten the service interval.
The complete function of the lift is to be observed during daily use. Customer service must be
informed of any malfunctions.

7.1 Lift maintenance plan

Before beginning service, disconnect from power. The system is to be secured
against unintentional lowering and unauthorizes access.
Maintenance sequence
Check the state of the model plate, load bearing capacity details on
the lift.
Free the piston rod of the lifting cylinder of dust, sand and dirt using
compressed air.
Lightly grease the spindle rods with a high-performance grease
(approx. 5 g per spindle rod) e.g. S2 DIN 51503 KE2G-60 from
Renolit.
Clean joint bolts of the lift arms,sliding rollers (standard lift arms) and
check for wear, exchange if required.
Clean the sliding pieces of the lift rails and check them for wear then
lubricate them with a multi-purpose grease.
Lubricate all lubrication nipples (double swivel arm) with a multi-
purpose grease. Grease moving parts. (e.g. multi-purpose grease
Auto Top 2000 LTD from Agip). Do not over-lubricate.
Check the hydraulic system for leaks. Check the condition of the
hydraulic lines and screw fittings.
Check the filling level of the hydraulic oil and fill or completely
replace with a clean oil with a viscosity of 32 cst.
The hydraulic oil must be changed at least once per year. To do this,
the lift must be in its lowest position, empty the oil container and
replace the contents. Dispose of the old oil according to regulations
to the intended location (district offices, environmental protection
office or commercial regulatory office has the obligation to disclose
about disposal points). The manufacturer recommends a high value,
clean hydraulic oil with a viscosity of 32 cst. For ambient
Operating Manual and Inspection Book
POWER LIFT HL 2.60 SST DG
- 26 -
Time frame
Min. 1x per year
Min. 1x per year
Min. 1x per year
Min. 1x per year
Min. 1x per year
Min. 1x per year
Min. 1x per year
Min. 1x per year

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

975482

Table des Matières