GOK BC-1 Notice De Montage Et De Service page 31

Masquer les pouces Voir aussi pour BC-1:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 33
Installation certificate from specialised company
I hereby confirm that the
following safety equipment was
installed correctly:
in accordance with the applicable assembly and operating manual. After ASSEMBLY, the
safety equipment underwent the start-up and a FUNCTION CHECK. Upon start-up, the
safety equipment operated properly. The operator was informed about the operation, care
and maintenance of the product in accordance with the assembly and operating manual.
Specialised company is
Operating medium or stored material ►
1)
More detailed description of the
operating medium
2)
Immerse the probe in the operating medium to be tested. Leave in a heating cabinet at
+ 60 °C for48 hours. Then carry out the specified FUNCTION TESTS at ambient
temperature. A certificate of the test and the result must be issued.
The probe (limit indicator) was installed in a tank:
Manufacturer:
Fabricate no.
Approval / test mark:
Tank acc. to construction standard
Rated volume in litres:
Maximum admissible level
Adjusting dimension X =
Overfill prevention divice type BC-1
• To be kept by system operator!
• Important for any warranty claims!
 Overfill sensor type BC-1
 GOK device no.:
 specialised company according to water law
 (electrical installation) company
 waste oil
 FAME
 fuel oil
 vegetable oil
 water or oil-water mixtures
 liquid fertiliser (AHL, ASL, HAS)
 JGS (liquid manure, semi-liquid manure and
silage effluent)
 other water-hazardous, non-flammable
liquids
 diesel fuel
 aqueous urea solution
 industrial oil
1) + 2)
% (V/V)
mm
15 / 16

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Bc-1-4Bc-1-2

Table des Matières