HellermannTyton Reliseal Mode D'emploi page 10

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 23
Installation
3 Connect the cores with the connector block.
f Observe the tightening torque of 3 Nm.
Connecting the cores.
4 Insert the cable connection into the bottom shell.
Inserting the cable connection.
5 Close the cable joint until the fasteners engage.
Closing the cable joint.
10
Installation instructions • Reliseal • 07-2016
6 Position the cable gland nuts on the cable and assemble.
f Ensure that the thread is aligned towards the cable joint.
Assembling the cable gland nuts.
7 Attach the cable gland nuts to the cable joint.
f Twist the cable gland nuts firmly onto the cable joint.
Attaching the cable gland nuts.
; The product has been successfully installed.

Publicité

Table des Matières
loading

Table des Matières