Beko BP109C Manuel D'utilisation page 20

Masquer les pouces Voir aussi pour BP109C:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 57
1
Safety awareness
- Cylinders shall be kept upright.
- Ensure that the refrigeration system is earthed prior to charging
the system with refrigerant.
- Label the system when charging is complete (if not already).
- Extreme care shall be taken not to overfill the refrigeration
system.
Prior to recharging the system it shall be pressure tested with OFN.
The system shall be leak tested on completion of charging but prior
to commissioning. A follow up leak test shall be carried out prior to
leaving the site.
9. Decommissioning
Before carrying out this procedure, it is essential that the technician
is completely familiar with the equipment and all its detail. It is
recommended good practice that all refrigerants are recovered
safely. Prior to the task being carried out, an oil and refrigerant
sample shall be taken in case analysis is required prior to re-use of
reclaimed refrigerant. It is essential that electrical power is available
before the task is commenced.
a) Become familiar with the equipment and its operation.
b) Isolate system electrically.
c) Before attempting the procedure ensure that: mechanical
handling equipment is available, if required, for handling
refrigerant cylinders; all personal protective equipment is
available and being used correctly; the recovery process
is supervised at all times by a competent person; recovery
equipment and cylinders conform to the appropriate standards.
20 / 396 EN
Local Air-conditioner / User Manual

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Bp112cBp112hBp109acBp109ahBp113h

Table des Matières