First Start-Up - Grundfos MAGNA3 65-XX Notice D'installation Et De Fonctionnement

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

6. First start-up

Do not start the pump until the system has been filled with liquid
and vented. Furthermore, the required minimum inlet pressure
must be available at the pump inlet. See section
data.
The system cannot be vented through the pump. The pump is
self-venting.
Step
Action
Switch on the power supply to the pump.
1
Note: When switched on, the pump will start in
AUTO
after approx. 5 seconds.
ADAPT
Pump display at first start-up.
2
After a few seconds, the pump display will change to the
start-up guide.
The start-up guide will guide you through the general
settings of the pump, such as language, date and time.
3
If the buttons on the pump control panel are not touched
for 15 minutes, the display will go into sleep mode.
When a button is touched, the "Home" display will appear.
When the general settings have been made, select the
4
desired control mode or let the pump run in AUTO
For additional settings, see section
19. Technical
.
ADAPT
7.
Settings.
Illustration
21

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Magna3 80-xxMagna3 100-xx

Table des Matières