Start-Up - Grundfos MAGNA 2000 Serie Notice D'installation Et D'entretien

Masquer les pouces Voir aussi pour MAGNA 2000 Serie:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

6. Start-up

Do not start the pump until the system has been filled
with liquid and vented. Furthermore, the required
minimum inlet pressure must be available at the
pump inlet, see section 11. Technical data.
The system cannot be vented through the pump.
The pump can be vented by slackening the
inspection screw.
WARNING!
If the inspection screw is to be
loosened, see fig. 7, care should be
taken to ensure that the escaping,
scalding hot liquid does not cause
personal injury or damage to
components.
Fig. 7
Venting the pump
8
Inspection screw

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Magna 40-120Magna 65-120Magna 65-60

Table des Matières