Procopi Wewa Rectangle Notice De Montage page 65

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

The installation described is a standard installation with the fi ltration group located
3.5 m from the pool as required by the safety standards in effect. You may need to alter
the lengths of the tubes to adapt to the confi guration of your terrain, the position of
your pool (above-ground, partially in-ground or in-ground), the type of plant housing
or a number of other installation constraints.
8 Weva Rect, wooden pool connections skin pack
5 Fixed, straight barbed union RC29 1»1/2x45 - grey
TORRO 40/60 circlips protection, tube D45 50x52
9 TORRO circlips 40-60/12 W4 A4
2'' 2-part union gasket (57x43)
Tefl on roll, width 12 mm, length 12 metres
Hex head screw 8x30 A2 DIN933
H nut 8 A2 DIN934
Washer M 8 A2 NFE25513
Magic 50, spacer Pa4.3x8x4
Blind nut M3 A2 DIN 1587
Pozi slotted head screw M3x16 A2 DIN 965 A
For the installation, refer to the sand fi lter assembly instructions below and the
operating guide enclosed with the pump. Examine the diagram of the fi ltration system
that shows the various elements and connections.
WARNINGS :
The fi ltration system provided in the kit, and every other electrical device, must be
wired in according to the standards applicable in the country of installation.
Do not hesitate to call in a professional to guarantee the compliance of your
PRECAUTIONS AND ADVICE:
Barrel unions (isolating valves) should be tightened by hand only, no tools are required.
In fact, excessive tightening can damage the threading or twist the seals leading to
leaks.
Wrap 3 or 4 turns of sealing tape around connections that have no seals.
Only the collar clamps (cerfl ex type) need to be tightened with a crosshead
screwdriver. Do not over tighten. Do not forget the rubber bands designed to cover the
collar clamps.
48200368 V610 fi ltration accessories pack, wooden pool #
261020
Drain/vent assembly
261035
Half clamp
263002
ABS lateral, length 200 mm
261005
Drain/vent plug o-ring
261007
Drain/vent o-ring (20x39)
1397100
Tefl on roll, width 12 mm, length 12 metres
7605451
Cylindrical head screw 8x60 A2 DIN84A
7671400
Nut Q 8 A2 DIN557
8051055
D40-2.5 b SL pressure gauge
48200068 V500 fi ltration accessories pack, wooden pool
2
261002
ABS lateral, length 145mm
10
261020
Drain/vent assembly
12
261035
Half clamp
2
1
261005
Drain/vent plug o-ring
2
261007
Drain/vent o-ring (20x39)
2
1397100
Tefl on roll, width 12 mm, length 12 metres
4
7605451
Cylindrical head screw 8x60 A2 DIN84A
3
7671400
Nut Q 8 A2 DIN557
3
8051055
D40-2.5 b SL pressure gauge
3
installation.
CAUTION
The pump's power
supply must be
protected by a
differential circuit
breaker installed
upstream from the
installation.
Installation of the
1
fi lter below the
2
water liner is strongly
1
recommended.
2
Above the water
1
2
line there is a risk of
2
deformation due to
1
depressurisation. The
maximum allowed is
level with the coping.
In the event that
8
the fi lter is installed
1
above the water
2
1
line, a fl ap valve
2
must be installed on
1
the return line and
2
2
an easily accessible
1
check valve must
be installed on the
suction line (these
items are available
from all pool
specialists).
65

Publicité

Chapitres

Table des Matières
loading

Table des Matières